Infrastructure

 Vidyalaya Infrastructure

 

I
Area of land  allotted (in acres)
 
Whether land transferred in the Name of Samiti
 
Vidyalaya shifted to permanent buildings on
 
:13.87 (Hect)
 
 
: Transfer of land is being processed and under    process at Tehsil at Alirajpur
 
: 2002
ii
Status of Boundary Wall
 
a.  Brick Wall
b.  Barbed wire fencing
 
 
: Completed
: In completed
iii
Permanent buildings constructed
: (CBRI pattern/ CPWD pattern)
: Both
iv
School building
: Complete
v
Dormitories
:  Boys 03 Nos.
   with Warden Residence NIL Nos.
(Extra 01 no of dorm. Under construction with warden residence)
 
 
:  Girls 01 Nos.
   with Warden Residence NIL Nos.
(Extra 01 no of dorm. Under construction with  warden residence)
vi
Kitchen/dining Hall
 
No. of shifts required for all students  to take food
:  Complete  
 
: 01 Nos.
vii
Principal Residence
:  01 No
viii
Staff Quarters
 
 
 
 
: Type III = 06 x 04 Nos.= 24
  Type II = 01Nos.
  Type  I  = 06 x 2 Nos. =12
  SP Sheds converted into Staff Qrs.:NIL Nos.
ix
M.P. Hall
: Available  
x
Workshop
: Available  
xi
Type of O.H. Tank
 
Its capacity
 
Present Status
: Column based
 
:  1.35 lakhs litres
 
: Working satisfactory  
xii
U.G. tank
 
Its capacity
 
Present Status
 
:  1.35 lakhs litres
 
: Working satisfactory  
xiii
D.G. Set
 
 
 
 
: Available / not available
: Kirlosker make
: 10  KV
: Working  
: Year of procurement : 1991
xiv
Sewage Pump
: NIL
xv
Water Pump
 
: 12 state 1.5 HP( Texmo make)capacity
xvi
Electrification
 
Electric connection
Sub Station building
Street lighting
 
Numbers of hrs. during day when power supply is available on an average.
 
 
 :  Urban Feeder
:  Complete
: 40 Nos. of Poles
 
: 5-6  hrs.
  
xvii
Playfields
 
400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court
 
 
: Available
: 02 Nos.   – Available  
: 02Nos.   – Available  
xviii
Water supply
Tube Well
Hand pump
Connection from PHED
 
 
: Potable,  01 Nos.-  working    
: Potable 05 Nos.-  working / 01 no not functioning
:  NIL  hours supply in a day
xix
Rajiv Gandhi Smriti Van
:  Available  
xx
Fire fighting arrangement
:  Working  
xxi
Last date of cleaning of
(a)    Septic tank
(b)    Water tanks
 
: 02.05.08
: 02.06.08
xxii
Whether area around transformer is fenced
:  Yes   
xxiii
Whether open wells, if any, are covered from top
:   Yes   
xxiv
Works taken up under M&R fund during current year and last year:-
:
Year
Name of work  (M&R)
Expenditure
(Rs. In lacs)
Cumulative expenditure during the year
2007-08
White wash & Paintings
156357.00
359000.00